Sewage drainage system - List of Manufacturers, Suppliers, Companies and Products | IPROS

Sewage drainage system Product List

1~2 item / All 2 items

Displayed results

Office Building Tenant Clinic | Case Study of Pressurized Drainage Pump Unit Adoption

We will introduce a case where a guest-only toilet was installed on an OA floor where plumbing could not be done under the floor.

We would like to introduce a case where "Sewage 120NPB (OZ120-100NPB)" was adopted for a clinic in an office building tenant. In this case, there was a challenge of wanting to install a dedicated restroom for visitors, but due to the OA floor, it was not possible to install drainage pipes under the floor. Since the restroom would be used by unspecified individuals, there was a high risk of foreign matter contamination, so a product with a backup function was adopted. A super water-saving toilet was used, and since it was not directly connected to the toilet, the inflow pipe length was kept within 2 meters and the number of joints was limited to 2. The pipe diameter was 75A and the slope was set to 1/50 or more. 【Case Overview (Partial)】 ■ Installation Location: Office Building Tenant ■ Models ・Discontinued: Sewage 120NPB (OZ120-100NPB) ・Alternative Model: Sewage and Waste Big NA (BG-201NA) ■ Connected Fixtures: Water-saving toilet (flush volume 5L, wall drainage, drainage center 155mm) and hand wash basin *For more details, please download the PDF or feel free to contact us.

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Railway Facilities Station Worker Rest Area | Case Study of Pressurized Drainage Pump Unit Adoption

We would like to introduce this as an exemplary case of construction that faithfully adheres to the standard specifications of the product!

We would like to introduce a case where the "Sewage and Wastewater Big NA (BG-201NA)" was adopted for the station worker's office at a railway facility. In this case, there was a plan to set up a prefabricated worker's office (break room) in an empty space within the concourse, but there was a desire to install water facilities inside the office. However, due to the absence of drainage pipes, it was necessary to pump the wastewater. A product with a backup function capable of handling wastewater was adopted, and it serves as a model example of faithful construction to the standard installation. [Case Overview (Partial)] ■ Installation Location: Station Worker’s Office ■ Model: Sewage and Wastewater Big NA (BG-201NA) ■ Connected Fixtures - Toilet (Reference Model Number: CS670BP) - Washbasin (Reference Model Number: LMBA060B1GDG1G) *For more details, please download the PDF or feel free to contact us.

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration