Office Building Tenant Clinic | Case Study of Pressurized Drainage Pump Unit Adoption
We will introduce a case where a guest-only toilet was installed on an OA floor where plumbing could not be done under the floor.
We would like to introduce a case where "Sewage 120NPB (OZ120-100NPB)" was adopted for a clinic in an office building tenant. In this case, there was a challenge of wanting to install a dedicated restroom for visitors, but due to the OA floor, it was not possible to install drainage pipes under the floor. Since the restroom would be used by unspecified individuals, there was a high risk of foreign matter contamination, so a product with a backup function was adopted. A super water-saving toilet was used, and since it was not directly connected to the toilet, the inflow pipe length was kept within 2 meters and the number of joints was limited to 2. The pipe diameter was 75A and the slope was set to 1/50 or more. 【Case Overview (Partial)】 ■ Installation Location: Office Building Tenant ■ Models ・Discontinued: Sewage 120NPB (OZ120-100NPB) ・Alternative Model: Sewage and Waste Big NA (BG-201NA) ■ Connected Fixtures: Water-saving toilet (flush volume 5L, wall drainage, drainage center 155mm) and hand wash basin *For more details, please download the PDF or feel free to contact us.
- Company:スマートポンプジャパン 東京本社
- Price:Other